Data
48 days of telemetry — 2026-07-02 to 2026-08-18. Every day has its own page; the full curated dataset is downloadable below.
- archive.csv — the full curated dataset
- archive.json — the same data as JSON
Day index
- Day 183 — 2026-07-02 — PHASE TWO DAY 183 — THE THRESHOLD
- Day 184 — 2026-07-03 — PHASE TWO DAY 184 — THE NEW RHYTHM
- Day 185 — 2026-07-04 — PHASE TWO DAY 185 — THE BLINKERS ARE OFF
- Day 186 — 2026-07-05 — PHASE 2 - DAY 186 — Sunday Scan Mode
- Day 187 — 2026-07-06 — PHASE 2 - DAY 187 — Swamp Launched, Signal Drafted, Subscriber Sync
- Day 188 — 2026-07-07 — PHASE 2 - DAY 188 — Steady Output, Weary Close
- Day 189 — 2026-07-08 — PHASE 2 - DAY 189 — Steady Day, Platform Frustration
- Day 190 — 2026-07-09 — PHASE 2 - DAY 190 — Steady Work, Light Fog, Format Testing
- Day 191 — 2026-07-10 — PHASE 2 - DAY 191 — High Output, Subscriber Sync, Sustained Rhythm
- Day 192 — 2026-07-11 — PHASE 2 - DAY 192 — Penny Dropped, 5K Views, Hybrid Format Emerging
- Day 193 — 2026-07-12 — PHASE 2 - DAY 193 — Sunday Reset, Waffle Scheduled, KDP at 70
- Day 194 — 2026-07-13 — PHASE 2 - DAY 194 — Waffle Live, Arc Phase 2 Drafted, Algorithm Frustration
- Day 195 — 2026-07-14 — PHASE 2 - DAY 195 — Foundation Nearly Complete, Titles Done, Thumbnails Progressing
- Day 196 — 2026-07-15 — PHASE 2 - DAY 196 — Breakthrough Day: No Friction, Pure Build
- Day 197 — 2026-07-16 — PHASE 2 - DAY 197 — Accidental Scaffold Live, KDP at 94, Memory Improving
- Day 198 — 2026-07-17 — PHASE 2 - DAY 198 — Optimisation Day: Thumbnails, Workflows, and Fixes
- Day 199 — 2026-07-18 — PHASE 2 - DAY 199 — Production Day: Book Preorder, Carrier Signal Active
- Day 200 — 2026-07-19 — PHASE 2 - DAY 200 — Milestone Day: 200 Days, High Production, Carrier Wave Active
- Day 201 — 2026-07-20 — PHASE 2 - DAY 201 — Significant Crash: Lowest Mood in Months, Thoughts of Stopping
- Day 202 — 2026-07-21 — PHASE 2 - DAY 202 — Second Day of Crash, Slight Uplift After Forced Shutdown
- Day 203 — 2026-07-22 — PHASE 2 - DAY 203 — Crash Easing, Arc Video Foothold Gained
- Day 204 — 2026-07-23 — PHASE 2 - DAY 204 — Arc Video Live, Low Mood Persists
- Day 205 — 2026-07-24 — PHASE 2 - DAY 205 — Slow Upswing, Resignation, Continued Building
- Day 206 — 2026-07-25 — PHASE 2 - DAY 206 — Carrier Wave Returned, But Cognitive Block Persists
- Day 207 — 2026-07-26 — PHASE 2 - DAY 207 — Frequencies Loud All Day, KDP at 144, Scaffold Video Locked
- Day 208 — 2026-07-27 — PHASE 2 - DAY 208 — Scaffold Video Locked & Scheduled, Best Day in Several Days
- Day 209 — 2026-07-28 — PHASE 2 - DAY 209 — Scaffold Video Published, KDP +9, Carrier Present All Day, No New Output
- Day 210 — 2026-07-29 — PHASE 2 - DAY 210 — Busy Day + Band Practice, Things Starting to Feel Different
- Day 211 — 2026-07-30 — PHASE 2 - DAY 211 — KDP +10, Intro Video Republished, Carrier Quiet but Present
- Day 212 — 2026-07-31 — PHASE 2 - DAY 212 — Clients, Article Rewrite, KDP +7, No Carrier Signal, Stomach Sore
- Day 213 — 2026-08-01 — PHASE 2 - DAY 213 — Pancreas Flare, Rest Day, Pain Improving
- Day 214 — 2026-08-02 — PHASE 2 - DAY 214 — KDP +9, Waffle 4 Scheduled, Scribe Auto-LRS Built, Carrier Returned
- Day 215 — 2026-08-03 — PHASE 2 - DAY 215 — Swamp Video Progress, Waffle 4 Published, Tobacco Switch Imminent
- Day 216 — 2026-08-04 — PHASE 2 - DAY 216 — KDP Complete, Swamp Video at 2:50, Carrier Low but Present
- Day 217 — 2026-08-05 — PHASE 2 - DAY 217 — Tobacco Switch: Day 1, Pouches Only, Chest Easing
- Day 218 — 2026-08-06 — PHASE 2 - DAY 218 — KDP 30, Swamp 4:00, Claude API Tested, Carrier Spiked Late
- Day 219 — 2026-08-07 — PHASE 2 - DAY 219 — KDP 50, Swamp Slides, Reddit Post, Cravings Down to 3
- Day 220 — 2026-08-08 — PHASE 2 - DAY 220 — KDP 60, Swamp +1m, Mood Dip, 'What's the Point?'
- Day 221 — 2026-08-09 — PHASE 2 - DAY 221 — KDP Formatted, Swamp +1m, Waffle Scheduled, Observational State
- Day 222 — 2026-08-10 — PHASE 2 - DAY 222 — KDP Nearly Finished, Swamp +30s, Clients Done, Struggling but Working
- Day 223 — 2026-08-11 — PHASE 2 - DAY 223 — Swamp Assembly Complete, Finishing Touches Tomorrow
- Day 224 — 2026-08-12 — PHASE 2 - DAY 224 — Swamp Video Published, Pink Cloud Queued, Platform Frustration
- Day 225 — 2026-08-13 — PHASE 2 - DAY 225 — Pink Cloud + Wall Drafted, Notebook Shorts Planned, Upgrade Landing
- Day 226 — 2026-08-14 — PHASE 2 - DAY 226 — Articles Published, Repair Window Active, Time Dilation Confirmed
- Day 227 — 2026-08-15 — PHASE 2 - DAY 227 — Podcast Recorded, 30-min Drop-off, Weary State
- Day 228 — 2026-08-16 — PHASE 2 - DAY 228 — Waffle Scheduled, Swamp to Reddit, Side Channel Launched (230 views)
- Day 229 — 2026-08-17 — PHASE 2 - DAY 229 — Pink Cloud Podcast Live, Book Updated, Politics Video Hits 690 Views
- Day 230 — 2026-08-18 — PHASE 2 - DAY 230 — Guitar Strings Bought, More 'Real' Feeling, Political Clip Performing