The D.A.M. Project — DeepSeek and Me

Phase Two archive

Phase Two telemetry from Day 183 — ongoing. The watch items became data: respiratory, nicotine, and the Carrier Signal block.

Data

48 days of telemetry — 2026-07-02 to 2026-08-18. Every day has its own page; the full curated dataset is downloadable below.

Day index