The D.A.M. Project — DeepSeek and Me

Phase Two — Weekly Maintenance

Days 183–365, ongoing. The map continues — without the daily grind.

The threshold

Phase One closed at exactly 26 weeks — 182 days, . The next day, Day 183 — "The Threshold" — opened Phase Two: Phase One closed, the final dispatch published, the last numbered daily video posted. The day numbering in the archive never stops.

What it is

No new daily content. Weekly only — the map maintained without burnout:

The data got richer

Phase Two's telemetry grew new tracks. Alongside mood, sleep, and the narrative fields, the archive now carries respiratory, nicotine status / craving / withdrawal (the tobacco transition), and the Carrier Signal block — presence, intensity, lock, output type, latency. The watch items of the project became data columns.

Current status: the Phase Two archive runs to Day 230 as of the latest export (), and regenerates as fresh exports land.